更新时间:2020-09-25 11:16:06
封面
版权信息
Forewords
1 Scope
2 Normative References
3 Terminology
3.1 Power Transformer
3.2 Oil-immersed Type Transformer
3.3 Converter Transformer
3.4 Reactor
3.5 Smoothing Reactor
3.6 Thyristor Valve
3.7 Converter Valves
3.8 Valve Cooling System
3.9 Instrument Transformer
3.10 Current Transformer
3.11 Direct Current Transducer(DCCT)
3.12 Optical Current Transformer
3.13 Voltage Transformer
3.14 Direct Voltage Divider
3.15 Capacitor
3.16 Capacitor Bank
3.17 Circuit Breaker
3.18 Disconnector
3.19 GIS(Gas Insulated Switchgear)
3.20 HGIS(Hybrid Switchgear)
3.21 Earthing Conductor
3.22 Earth-termination system
3.23 Earthing
3.24 Earthing Resistance
3.25 Concentrated Earth-termination system
3.26 Protective earthing
3.27 Earth electrode
3.28 Earthing Grid
3.29 Step Potential Difference
3.30 Touch Potential Difference
3.31 Equal potential Bonding
3.32 Equal potential Bounding Conductor
3.33 Earthing Electrode Cadweld
4 General Provisions
5 Thyristor Converter Valves
5.1 General Requirements
5.2 Requirements for Valve Halls
5.3 Installation Apparatuses and Tools
5.4 Inspection and Safekeeping Prior to Installation
5.5 Installation of Converter Valves
5.6 Optical Cable Laying
5.7 Checking and Test
5.8 Hand-over and Acceptance
6 Water Cooling System of Converter Valves
6.1 General Provisions
6.2 Checking and Safekeeping Prior to Installation
6.3 Installation of Internal Water Cooling System
6.4 Installation of External Water Cooling System
6.5 Check and Test
6.6 Handover and Acceptance
7 Converter Transformer and Oil-immersed Smoothing Reactor
7.1 General Requirements
7.2 Loading,Unloading,and Transportation
7.3 Inspection and Storage Prior to Installation
7.4 Nitrogen Discharge and Internal Check
7.5 Installation of the Proper and Accessories
7.6 Vacuum-pumping of the Proper
7.7 Oil Filling under Vacuum
7.8 Hot Oil Circulation
7.9 Overall Airtightness Checking
7.10 Keeping Still and Electrical Tests
7.11 Moving in Place within Station
7.12 Hand-over and Acceptance
8 AC and DC Filters(including AC high-voltage shunt capacitor banks)
8.1 General Requirements
8.2 Foundations,Anchor Bolts,and Suspension Structures
8.3 Check Prior to Installation
8.4 Installation of Capacitor Banks
8.5 Installation of Auxiliary Devices
8.6 Connection and Checking
8.7 Electrical Tests
8.8 Hand-over and Acceptance
9 DC Switchgears
9.1 General Requirements
9.2 Inspection and Safekeeping Prior to Installation
9.3 Installation of Insulation Platform
9.4 Installation of Breakers
9.5 Installation of Auxiliary Devices of DC Switchgear
9.6 Hand-over and Acceptance
10 DC Wall Bushings
10.1 General Provisions
10.2 Inspection and Safekeeping Prior to Installation
10.3 Installation and Test of Bushings
10.4 Hand-over and Acceptance
11 Dry Reactor
11.1 General Requirements
11.2 Foundations and Supports
11.3 Inspection and Safekeeping Prior to Installation
11.4 Installation and Test of Reactors
11.5 Hand-over and Acceptance
12 Air Conditioning and Ventilation System
12.1 General Requirements
12.2 Inspection and Safekeeping Prior to Installation
12.3 Installation of Indoor and Outdoor Air Conditioning Units