DL/T5232-2010±800kV及以下直流换流站电气装置安装工程施工及验收规程(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

图书在版编目(CIP)数据

DL/T 5232-2010±800kV及以下直流换流站电气装置安装工程施工及验收规程:英文/中国电力企业联合会组织编译.--北京:中国计划出版社,2017.11

ISBN 978-7-5182-0743-5

Ⅰ.①D… Ⅱ.①中… Ⅲ.①直流换流站-电气设备-设备安装-工程施工-规程-英文②直流换流站-电气设备-设备安装-工程验收-规程-英文 Ⅳ.①TM63-65②TM05-65

中国版本图书馆CIP数据核字(2017)第271280号

Chinese edition first published in the People's Republic of China in 2010

English edition first published in the People's Republic of China in 2017

by China Planning Press

3rd Floor,C Tower,Guohong Building

No.A11,Muxidi-Beili,Xicheng District

Beijing,100038

www.jhpress.com

Printed in China by Factory attached to Beijing Institute of Graphic Communication

©2010 by the State Economic and Trade Commission of the People's Republic of China

All rights reserved.No part of this publication may be reproduced or transmitted in any form or by any means,graphic,electronic,or mechanical,including photocopying,recording,or any information storage and retrieval systems,without written permission of the publisher.

This book is sold subject to the condition that it shall not,by way of trade or otherwise,be lent,resold,hired out or otherwise circulated without the publisher's prior consent in any form of blinding or cover other than that in which this is published and without a similar condition including this condition being imposed on the subsequent purchaser.

ISBN 978-7-5182-0743-5