Foreword
1 Scope
2 Normative References
3 General Provisions
4 Construction Quality Acceptance
4.1 Provisions for Construction Quality Acceptance
4.2 Construction Quality Acceptance Scope Division and General Tables
4.3 General Standards
4.4 Raw Water Pretreatment System
4.5 Sea Water Desalination System
4.6 Demineralization System
4.7 Condensate Treatment System
4.8 Circulating Water Treatment System
4.9 Wastewater Treatment System
4.10 Hydrogen Station
4.11 Steam—Water Centralized Sampling,Feedwater,Boiler water Treatment System
4.12 Anti-corrosion Work
5 Individual Project Quality Evaluation
5.1 Basic Provisions
5.2 Evaluation Provisions
5.3 Evaluation Contents
5.4 Evaluation Methods
5.5 Evaluation of Equipment Installation Construction Quality
5.6 Evaluation of Rotating Machinery Installation Construction Quality
5.7 Evaluation of Piping and Valve Installation Construction Quality
5.8 Evaluation of Anti-corrosion,Painting and Insulation Construction Quality
5.9 Summary of Scores of Construction Quality Evaluation of Various Project Parts(Scope)of the Individual Project
5.10 Individual Project Quality Evaluation Report
6 Single Unit Quality Evaluation
7 Evaluation of Overall Project Quality
Appendix A (Informative)Hydrogen Pipe Installation Parameter Datasheet
Appendix B (Normative)Checklist of Implementation of Compulsory Provisions
Appendix C (Normative)Unit Project Appearance Quality Acceptance Visa Table
Appendix D (Normative)List of Unit Project Visa Items
Explanations of Provisions
4.1 Provisions for Contruction Quality Acceptance
4.11 Steam-Water Centralized Sampling,Feedwater,Boiler Water Treatment System
Appendix A(Informative)Hydrogen Pipe Installation Parameter Datasheet
Appendix B(Normative)Checklist of Implementation of Compulsory Provisions
Appendix C(Normative)Unit Project Appearance Quality Acceptance Visa Table
Appendix D(Normative)List of Unit Project Visa Items