DL/T5210.6-2009电力建设施工质量验收及评价规程第6部分:水处理剂制氢设备和系统(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

4.4 Raw Water Pretreatment System

4.4.1 Installation of air separators.

1 Scope of application:equipment for completing suspension clarifier.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.1.

Table 4.4.1 Installation of air separators

img

Table 4.4.1(Continued)

img

4.4.2 Installation of sludge dehydrator.

1 Scope of application:raw water pretreatment,industrial wastewater treatment system.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.2.

Table 4.4.2 Installation of sludge dehydrator

img

4.4.3 Trial run of sludge dehydrator.

1 Scope of application:raw water pretreatment,industrial wastewater treatment system.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.3.

Table 4.4.3 Trial run of sludge dehydrator

img

4.4.4 Installation of suspension clarifiers.

1 Scope of application:suspension clarifier equipment.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.4.

Table 4.4.4 Installation of suspension clarifiers

img

Table 4.4.4(Continued)

img

4.4.5 Installation of mechanical mixing clarification tanks.

1 Scope of application:installation of various mechanical mixing clarifier parts of concrete structure.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.5.

Table 4.4.5 Installation of mechanical mixing clarification tanks

img

Table 4.4.5(Continued)

img

4.4.6 Trial run of mechanical mixing clarification tanks.

1 Scope of application:trial run of water treatment mechanical mixing clarifier equipment.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.6.

Table 4.4.6 Trial run of mechanical mixing clarification tan ks

img

4.4.7 Installation of hydraulic circulation clarification tank.

1 Scope of application:installation of hydraulic circulation clarification tank parts.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.7.

Table 4.4.7 Installation of hydraulic circulation clarification tank

img

Table 4.4.7(Continued)

img

4.4.8 Trial run of hydraulic circulation clarification tank.

1 Scope of application:installation of hydraulic circulation clarification tank parts.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.8.

Table 4.4.8 Trial run of hydraulic circulation clarification tank

img

4.4.9 Installation of clarification tank inclined plates(pipes).

1 Scope of application:clarification equipment of raw water pretreatment,wastewater treatment system.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.9.

Table 4.4.9 Installation of clarification tank inclined plates(pipes)

img

4.4.10 Installation of filter chambers.

1 Scope of application:gravity valveless,single valve,double-valve filter chamber and siphon filter chamber.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.10.

Table 4.4.10 Installation of filter chamber

img

Table 4.4.10(Continued)

img

4.4.11 Installation of ultra-filtration/microfiltration devices.

1 Scope of application:ultra-filtration equipment.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.11.

Table 4.4.11 Installation of ultra-filtration/microfiltration devices

img

4.4.12 Installation of mechanical filters.

1 Scope of application:such filters as single-flow,double-flow,double-layered filtering material,triple-layered filtering material,fiber ball,activated carbon,and phosphate.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.12.

Table 4.4.12 Installation of mechanical filters

img

Table 4.4.12(Continued)

img

4.4.13 Packing.

1 Scope of application:various types of filters,exchangers,CO2 removal devices,acid mist absorbers and filter chambers.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.13.

Table 4.4.13 Packing

img

4.4.14 Installation of reverse osmosis device.

1 Scope of application:raw water pretreatment,demineralized water,sea water desalination system reverse osmosis devices.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.14.

Table 4.4.14 Installation of reverse osmosis devices

img

4.4.15 Installation of reverse osmosis membrane.

1 Scope of application:reverse osmosis devices.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.15.

Table 4.4.15 Installation of reverse osmosis membrane

img

Table 4.4.15(Continued)

img

4.4.16 Installation of security filters.

1 Scope of application:equipment for completing the reverse osmosis devices.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.16.

Table 4.4.16 Installation of security filters

img

4.4.17 Installation of lime crane.

1 Scope of application:water treatment equipment.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.17.

Table 4.4.17 Installation of lime crane

img

Table 4.4.17(Continued)

img

4.4.18 Installation of slaked lime machine.

1 Scope of application:installation of slaked lime machine equipment.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.18.

Table 4.4.18 Installation of slaked lime machine equipment

img

Table 4.4.18(Continued)

img

4.4.19 Trial run of slaked lime machine.

1 Scope of application:trial run of slaked lime machine equipment.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.19.

Table 4.4.19 Trial run of slaked lime machine equipment

img

4.4.20 Installation of heat exchanger.

1 Scope of application:heat exchange equipment.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.20.

Table 4.4.20 Installation of heat exchanger

img

4.4.21 Installation of pipe mixer.

1 Scope of application:water treatment system pipe mixed type chemical dosing devices.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.21.

Table 4.4.21 Installation of pipe mixer

img

Table 4.4.21(Continued)

img

4.4.22 Installation of metal structure water tanks.

1 Scope of application:various types of metal structure water tanks.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.22.

Table 4.4.22 Installation of metal structure water tanks

img

4.4.23 Installation of concrete structure water tanks.

1 Scope of application:various types of concrete structure water tanks.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.23.

Table 4.4.23 Installation of concrete structure water tanks

img

4.4.24 Installation of floating roof water tanks.

1 Scope of application:water tanks with hard,soft floating roof structure.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.24.

Table 4.4.24 Installation of floating roof water tanks

img

Table 4.4.24(Continued)

img

4.4.25 Installation of single-beam bridge cranes.

1 Scope of application:water treatment system.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.25.

Table 4.4.25 Installation of single-beam bridge cranes

img

4.4.26 Installation of bag dust collectors.

1 Scope of application:water treatment system.

2 Inspection quantity:check them one by one.

3 Quality standards and inspection methods are as shown in Table 4.4.26.

Table 4.4.26 Installation of bag dust collectors

img

4.4.27 Inspection of the compulsory provision implementation of the raw water pretreatment system shall conform to Table 4.4.27.

Table 4.4.27 Inspection table of compulsory provision implementation of the raw water pretreatment system

img

Table 4.4.27(Continued)

img