
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
10.3 Buggy Ladle
General Items
10.3.1 The allowable deviation for installation of buggy ladle shall comply with the requirements in Table 10.3.1.
Quantity to be checked:100%.
Inspection method:See Table 10.3.1.
Table 10.3.1 Allowable deviation for installation of buggy ladle

Table 10.3.1(Continued)
