更新时间:2020-09-25 15:30:59
封面
版权信息
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms
3 Basic Requirements
3.1 Construction Basis
3.2 Construction Preparation
3.3 Construction Procedure
3.4 Construction Safety
3.5 Environmental Protection
3.6 Project Acceptance
4 Waste Heat Boiler
4.1 General Requirements
4.2 Boiler Steel Frame and Related Accessories
4.3 Pressure Parts
4.4 Auxiliary Pipeline and Equipment
4.5 Boiler Drying,Boiling Out,Purging and Tightness Test
4.6 Project Acceptance
5 Gas Duct and Related Equipment
5.1 General Requirements
5.2 Assembly and Installation of Gas Duct
5.3 Installation of Dust Separator
5.4 Installation of Gas Damper
5.5 Installation of Dust Collection System
5.6 Installation of Expansion Joint of Gas Duct
5.7 Project Acceptance
6 Steam Turbine and Generator Set
6.1 General Requirements
6.2 Steam Turbine and Generator Set
6.3 Generator and Exciter
6.4 Governing Protection System and Oil System
6.5 Pipeline of steam turbine proper
6.6 Auxiliary equipment
6.7 Individual Test of the Accessories and Auxiliary of Steam Turbine Generator Set
6.8 Project acceptance
7 Pipeline
7.1 General Requirements
7.2 On-site Quality Inspection and Acceptance of Pipeline Components
7.3 Preparation of Pipeline and Components
7.4 Pipeline Installation
7.5 Test and Flushing for the Pipeline System
7.6 Project Acceptance
8 Welding
8.1 General Requirements
8.2 Steel,Welding Materials and Equipment
8.3 Preparation before Welding
8.4 Welding Procedure
8.5 Heat Treatment After Welding
8.6 Project Acceptance
9 Thermodynamic Instruments and Automation Control Devices
9.1 General Requirements
9.2 Installation of Source Component and Sensitive Elements
9.3 Installation of Local Instrument
9.4 Control Panel(Console,Box,Cabinet)Installation
9.5 Pipeline Laying and Connection
9.6 Protection and Grounding
9.7 Debugging of Thermodynamic and Automatic Instruments and Control Devices
9.8 Project Acceptance
10 Electrical Equipment and System
10.1 General Requirements
10.2 Installation of Cable Tray
10.3 Cable Laying
10.4 Complete Set of HV Switch Cabinet
10.5 Complete Set of LV Switch Cabinet
10.6 Generator
10.7 Transformer
10.8 Motor
10.9 Bus Device
10.10 Electrical Secondary Circuit Connection
10.11 DC System Devices
10.12 Relay Protection,Electrical Measurement and Automatic Device
10.13 Grounding System
10.14 Project Acceptance
11 Water Treatment
11.1 General Requirements
11.2 Reverse Osmosis Device
11.3 Boiler Make-up Water Treatment
11.4 Sampling and Dosing System
11.5 Circulating Cooling Water Treatment
11.6 Tank
11.7 Rotating Machinery
11.8 Special Pipe and Valves
11.9 Anticorrosion Works
11.10 Startup and Commissioning
11.11 Chemical Supervision in Trial Operation of the Rmal Equipment
11.12 Project Acceptance
12 Construction Works
12.1 General Requirements
12.2 Foundation
12.3 Concrete Structure
12.4 Steel Structure
12.5 Equipment Foundation and Underground Channel
12.6 Construction measurement and Settlement Observation
12.7 Building Facilities
12.8 Project Acceptance
13 Heat-insulation and Paint
13.1 General Requirements
13.2 Heat-insulation of Equipment