2.2 Symbols
2.2.1 The following provisions for symbols shall be observed for survey:
a——fixed error
b——scale error coefficient
D——distance between adjacent points
d——distance between adjacent straight-line stakes or tower location stakes
DEM——Digital Elevation Model
DJ6,DJ2,DJ1——grades of optical theodolite series
DS10,DS3,DS1——grades of level series
fk——principal distance of aerial camera
GPS——Satellite Positioning Survey
n——number of measured legs,points or survey stations
RTK GPS——real-time,dynamic satellite positioning survey
S——side length,leg length,route length,side length of house
WGS84——World Geodetic System
Ws——linear misclosure
WX,WY,WZ——misclosure components
σ——standard deviation of baseline
Δd——transverse offset distance.
2.2.2 The following provisions for symbols shall be observed for geotechnical investigation:
b——base width
d——diameter or side length of a pile shaft
g——gravitational acceleration
p——value of stress due to the self-weight of soil mass
δz——additional stress at the depth σz in the subgrade.
2.2.3 The following provisions for symbols shall be observed for engineering hydrological investigation and surveying:
Cv——coefficient of variation
Cs——skewness coefficient
n——roughness.
2.2.4 The following provisions for symbols shall be observed for engineering meteorological investigation and surveying:
B——design ice thickness
B0——standard ice thickness
V10min——10-min average maximum wind speed
VTmin——2-min average or instantaneous maximum wind speed.