6.14 Survey Results to be Submitted

6.14.1 The survey results obtained during the detailed design stage shall include:

1 Technical survey report

2 Plans and sections

3 Sections of tower foundation

4 Topographic maps of tower locations

5 Layout maps of houses

6 Plans of crowded areas

7 Sub-maps of major crossing-over

8 Relative position maps of dangerous effects of communication lines

9 Sheet of coordinates of tower locations

10 Survey results of hydrological sections.

6.14.2 The technical survey report during the detailed design stage should cover the following:

1 Source of assignment and requirements;

2 Survey scope and description of survey area;

3 Readily available data;

4 Technical basis;

5 Participating personnel;

6 Instruments and equipment used;

7 Quantity of work completed;

8 Control survey;

9 Line selection survey;

10 Digital photogrammetry;

11 Routing,distance between stakes,elevation,plans and sections,crossing-over,connection survey of coordinates and elevations;

12 Location and check survey;

13 Survey on sections of tower foundations and topography of tower locations;

14 Survey for layout maps of houses and investigation of forest trees;

15 Application of new technologies or special methods,and their effects;

16 Contents of the survey results submitted;

17 Other issues to be described;

18 Sheet of control survey results,description of station.

19 Results list of tower location stake.

6.14.3 The following electronic documents shall be submitted:plans and sections,sections of tower foundations,layout maps of houses,topographic maps of tower locations,sub-maps of crossing-over,coordinates of tower location.

6.14.4 When the electronic products are converted to the interface data of design arrangement,the data shall be complete and accurate.