5.11 Final Results to be Submitted
5.11.1 The following final results should be submitted during the preliminary design:
1 Plans and sections of major crossing-over;
2 Plans of crowded areas;
3 Plans of incoming/outgoing lines of substations;
4 Survey results of hydrological sections;
5 Results of GPS field control and route annotation report;
6 Technical report of survey.