SH/T3536-2011石油化工工程起重施工规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

8 Rigging Hardware

8.1 General Requirements

8.1.1 Rigging hardware shall be used in accordance with the technical parameters defined in the manufacturer′s technical documents,and shall never be overloaded.

8.1.2 Ropes shall not be directly in contact with sharp objects when in use,and if unavoidable,protection shall be provided.

8.1.3 Rigging hardware shall be stored in a dry and well-ventilated place,and shall not be exposed to any heat or moisture.Contact with corrosive medium,such as acid and alkali,shall be avoided.