DL/T5161.4-2002电气装置安装工程质量检验及评定规程第4部分:母线装置施工质量检验(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

1 Installation of Supporting(Hanging)Frame and Protection Net

1.0.1 This chapter is applicable to installation of busbar supporting(hanging)frame and the protection net for power supply device and electric equipment.

1.0.2 Table 1.0.2 refers to installation and checkout of supporting(hanging)frame.

Table 1.0.2 Installation of supporting(hanging)frame

img

1.0.3 Installation and inspection of protection net are shown in Table 1.0.3.

Table 1.0.3 Installation of protection net

img

Table 1.0.3(continued)

img