铁路车载探地雷达路基检测技术
上QQ阅读APP看书,第一时间看更新

参考文献

[1]Al⁃Qadi I L,Xie W,Roberts R.Scattering Analysis of Railroad Ballast Using Ground Penetrat⁃ing Radar.Journal of Nondestructive Testing and Evaluation,2008,41(6):441⁃447.

[2]Al⁃Qadi I L,Roberts R,Tutumluer E,et al.New Ground Penetrating Radar Analysis Tech⁃niques for Ballast Assessment.Technology Digest,2009,TD⁃09⁃028,Association of AmericanRailroads,Transportation Technology Center,Inc.,Pueblo,CO.

[3]Al⁃Qadi I L,Xie W,Roberts R,et al.Data Analysis Techniques for GPR Used for AssessingRailroad Ballast in High Radio⁃Frequency Environment.Journal of Transportation Engineering,2010,136(4):392⁃399.

[4]Al⁃Qadi I L,Xie W,Jones D L,et al.Development of a Time⁃frequency Approach to QuantifyRailroad Ballast Fouling Condition Using Ultra⁃wide Band Ground⁃penetrating Radar Data.Spe⁃cial Issue on Nondestructive Testing,2010,19(10):763⁃772.

[5]Al⁃Nuaimy W,Gascoyne A E J.Train⁃Mounted GPR for High⁃Speed Rail Trackbed Inspection,Proceedings of the Tenth International Conference on Ground Penetrating Radar(GPR 2004),21⁃24 June 2004,Delf,S.631⁃634.

[6]Berggren E G,Smekal A,Silvast M.Monitoring and Substructure Condition Assessment of Ex⁃isting Railway Lines for Upgrading to Higher Axle Loads and Speeds.Proceeding of 7th WorldCongress on Railway Research,2006.

[7]Bold R D,O’Connor G,Morrissey J P,et al.New Analysis of Ground Penetrating Radar Tes⁃ting of a Mixed Railway Trackbed.Transportation Research Board 89th Annual Meeting,2010.

[8]Brightwells,Thomas M.Geophysical Assessment of Railway Assets⁃a Practical View.Proceed⁃ings of 6th International Conference on Railway Engineering,2003.

[9]Brough M,Stirling A,Ghataora G,et al.Evalution of Railway Trackbed and Formation:aCase Study.NDT & International,2003,36(3):145⁃156.

[10]Butler D,Dawson J.Ground Penetrating Radar Investigation of Ballast on the CN and CP RailLines Near Ashcroft,British Columbia.2006,Transport Canada Publication No TP14607E,26.

[11]Carpenter D,Jackson P J,Jay A.Enhancement of the GPR Method of Railway Trackbed In⁃vestigation by the Installation of Radar Detectable Geosynthetics.NDT&E International,2004,37(2):95⁃103.

[12]Clark M R,Gillespie R,Kemp T,et al.Electromagnetic Properties of Railway Ballast.NDT& E International Journal,2001,34(5),305⁃311.

[13]Clark M,Gordon M O,Forde M C.Issues Over High⁃Speed Non⁃invasive Monitoring of Rail⁃way Trackbed.NDT&E International,2004,37(2):131⁃139.

[14]Dae⁃Sang K.Evaluation on the Condition of Track Substructure Using GPR/PBS/LFWD,Ko⁃rean Geotechnical Society,2005,21(5):163⁃170.

[15]Doshi A,Al⁃Nuaimy W.Automatic Processing of Train⁃Mounted GPR Data for Ballast Inspec⁃tion.Progress In Electromagnetics Research Symposium,2006,26⁃29.

[16]Eriksen A,Venables B,Gascoyne J,et al.Benefits of High Speed GPR to Manage TrackbedAssets and Renewal Strategies.PWI Conference,Brisbane,Australia,19th June 2006,.

[17]Galagher G P,Leiper Q,Williamson R,et al.Application of Ground Penetrating Radar in theRailway Industry:Proceedings of the 1st International Conference Railway Engineering⁃98.Technical Press,London,1999.

[18]Galagher G P,Leiper Q,Williamson R,et al.The Application of Time Domain GroundPenetrating Radar to Evaluate Railway Track Ballast.NDT&E International 1999,32(8):463⁃468.

[19]Gascoyne A E J,Al⁃Nuaimy W.Improved Productivity & Reliability of Ballast Inspection U⁃sing Road⁃Rail Multi⁃Channel GPR.Railway Engineering 2004,London,UK:CommonwealthInstitute 6th⁃7th July 2004.

[20]Geraadss,Charachon B,Loeffler O,et al G.Applying a Wavenumber Notch Filter to Re⁃move Interferences Caused by Railway Sleepers from a GPR Section.9th International Confer⁃ence on Ground Penetrating Radar,Procedings of SPIE 2002,4758:715⁃718.

[21]Houck R T.Subsurface ImagingWith Ground Penetrating Radar,PhD thesis,The PennsylvaniaState University,1984.

[22]Hrubec K.Geophysical Exploration in a Segment of a Railway Line Bicske⁃Szárliget(Hunga⁃ry).Proc.7th Int.Con.Railway Engineering,2004.

[23]Hyslip J P.Demands on the Subgrade Drive GPR Developments.Railway Gazette Internation⁃al,2005,(1):37⁃39.

[24]Hyslip J P,Olhoeft G R,Smithss,et al.Ground Penetrating Radar for Railroad Track Sub⁃structure Evalution.DOT/FRA/ORD⁃05/04,Federal Railroad Administration,Washington,D.C,2005.

[25]Hugenschmidt J.Railway Track Inspection Using GPR⁃Some Examples from Switzerland.Pro⁃ceeding of Seventh International Conference on Ground Penetrating Radar,1998,1 of 2:197⁃202.

[26]Hugenschmidt J.Railway Track Inspection Using GPR.Journal of Applied Geophysics,2000,(43):147⁃155.

[27]Jack R,Jackson P.Imaging Attributes of Railway Track Formation and Ballast Using GroundProbing Radar.NDT & E International Journal,1999,32(8):457⁃462.

[28]Keogh T,Mesher D E,Keegan T R.An Integrated System for Accurate Tie and Ballast Condi⁃tion Assessment.Rail RadarTMInc and Canadian National Railway,2006.

[29]Khakiev Z.B,Bilalov V A,Morozov A V,et al.Wideband Narrow Directional Antennas forCondition Monitoring of the Railway Tracks Ballast Section.2nd EAGE and Geomodel Engi⁃neering Geopysics Conference,2006.

[30]Khakiev Z B,Bilalov V A,Morozov A V,et al.Improving GPR Monitoring of Track Ballastand Railway Structrural Integrity.Russia and CIS,2009,March,27:93⁃95.

[31]Leng Z,Al⁃Qadi I L.Dielectric Constant Measurement of Railroad Ballast and Application ofSTFT for GPR Data Analysis.NDTCE’09,Non⁃Destructive Testing in Civil Engineering,Nantes,France,2009.

[32]Leng Z,Al⁃Qadi I L,Davis D D.Data Analysis of Railroad Substructure Conditions usingGround Penetrating Radar,Technology Digest,TD⁃09⁃033,December 2009.Association ofAmerican Railroads,Transportation Technology Center,Pueblo,CO,2009.

[33]Loizos A,Plati C.Ground Penetrating Radar:A Smart Sensor for the Evaluation of the Rail⁃way Trackbed.Instrumentation and Measurement Technology Conference.Warsaw,Poland,2007,1⁃6.

[34]Manacorda G,Morandi D,Sparri A,et al.A Customized GPR System for Railroad TracksVerification.Proceedings of the Ninth International Conference on Ground Penetrating Radar,April 29⁃May 2,2002,Santa Barbara,California.S Koppenjan & H Lee(Eds)Proc.ofSPIE,2002,4758:719⁃723.

[35]Moynihan T W,English G W.Railway Safety Technologies.Railway Safety Act Review Secre⁃tariat of Research and Traffic Group,2007.

[36]Narayanan R M,Kumke C J,Li D.Railroad Track Substructure Monitoring Using GroundPenetrating Radar(GPR).Rail Int.,2001;32(1):28⁃34.

[37]Narayanan R M,Kumke C J,Li D Q.Railroad Track Monitoring Using Ground PenetratingRadar:Simulation Study and Field Measurements.Part of the SPIE Conference on SubsurfaceSensors and Applications,Denver,Colorado,1999,3752:234⁃251.

[38]Narayanan R M,Machavaram R N,Li D,et al.Analysis of Track Modulus Estimation ModelsUsing Ground Penetrating Radar Data,Rail International,2004,35(8):22⁃30.

[39]Noon D A,Stickley G F,Longstaff D.A Frequency⁃Independent Characteristics of GPR Pen⁃etration and Resolution Performance.Journal of Applied Geophysics,1998.(40):127⁃137.

[40]Olhoeft G R,Selig E T.Ground Penetrating Radar Evaluation of Railroad Track SubstructureConditions.Proceedings of the 9th International Conference on Ground Penetrating Radar,2002,48⁃53.

[41]Olhoeft G R,Smiths,Hyslip J P,et al.GPR in Railroad Investigations.Proceedings of 10thInternational Conference on Ground Penetrating Radar,21⁃24 June,2004,Delft,The Neth⁃erlands.

[42]Read D,Hyslip J,McDaniel R,et al.Revenue Service Track Substructure Investigation,Technology Digest TD10⁃006,Association of American Railroads,Transportation TechnologyCenter,Inc.,Pueblo,CO,2010.

[43]Roberts R,Al⁃Qadi I L,Tutumluer E,et al.Advances in Railroad Ballast Evaluation Using2GHz Horn Antenna.Proc.,11th International Conference on Ground Penetrating Radar(CD),Columbus,Ohio,2006.

[44]Roberts R,Al⁃Qadi I L,Tutumluer E,et al.Subsurface Evaluation of Railway Track UsingGround PenetratingRadar.ResearchReport,12/04⁃09/08,U.S:DepartmentofTransportation Federal Railroad Administration,2009.

[45]Saarenketo T,Silvast M,Noukka J.Using GPR on Railways to Identify Frost Susceptible Are⁃as.Proceedings of 6th International Conference on Railway Engineering,London,UK,30April⁃1May,2003.

[46]Saarenketo T.Electrical Properties of Road Materials and Subgrade Soils and the Use ofGround Penetrating Radar in Traffic Infrastructure Surveys,PhD Thesis,University ofOulu,2006.

[47]Selig E T,Hyslip J P,Olhoeft G R,et al.Ground Penetrating Radar for Track SubstructureCondition Assessment,Proceedings STS Implementation of Heavy Haul Technology forNetwork Efficiency,International Heavy Haul Association,2003.

[48]Shao W,Bouzerdoum A,Phungs L,et al.Automatic classification of GPR signals.13th In⁃ternational Conference on Ground Penetrating Radar(GPR),2010.

[49]Silvast M,Levomäki M,Nurmikolu A,et al.NDT Techniques in Railway Structure Analysis.Proceedings of 7th World Congress on Railway Research,2006.

[50]Silvast M,Nurmikolu A,Wiljanen B,et al.Inspection of Railway Ballast Quality Using GPRin Finland,Proceedings 9th International Heavy Haul Conference,Shanghai,2009.

[51]Smekal A,Berggren A,Hrubec K.Track⁃Substructure Investigations Using Ground PentratingRadar and Track Loading Vehicle.Proceedings of 6th International Conference on Railway En⁃gineering,2003.

[52]Staccone G.Safe Rail Track Bed Inspection by High Speed Radar.Proceedings of the interna⁃tional conference and exhibition railway engineering,2003.

[53]Staccone G,Haan E.Safe Rail Track Bed Investigation by High Speed Radar.Proceedings of6th International Conference on Railway Engineering,2003.

[54]Sussmann T R.Application of Ground Penetrating Radar to Railway Track Substructure Main⁃tenance Managemen.PhD Thesis,University of Massachusetts,Amherst,M A,1999.

[55]Sussmann T R,Selig E T,Hyslip J P.Railway Track Condition Indicators from Ground Pene⁃trating Radar,NDT & E International Journal,2003,36(3):157⁃167.

[56]Su L,Cholachat R,Buddhima I.An Evaluation of Fouled Ballast in a Laboratory Model TrackUsing Ground Penetrating Radar.Geotechnical Testing Journal,2010,33(5):343⁃350.

[57]Xie W,Al⁃Qadi I L,Jones D L,et al.Development of a Time⁃Frequency Approach to Quanti⁃fy Railroad Ballast Fouling Condition Using UWB GPR Data.87th TRB AnnualMeetings,2008.

[58]Yavna V A.GPR Researches of Railway Facility,4th International GPR Conference,2004.

[59]杜攀峰,廖立坚,杨新安.铁路路基病害的智能识别[J].铁道学报,2010,32(2):142⁃146.

[60]付国强.铁路路基病害探地雷达新技术探测研究[J].路基工程,2006,(2):20⁃22.

[61]付国强.路基病害探地雷达探测模型正演研究[J].路基工程,2006,(2):31⁃33.

[62]郭振威.预测反褶积在专用雷达检测冻土路基试验数据处理中的应用研究[D].长沙:中南大学,2010.

[63]郭秀军,韩宇,孟庆生,等.铁路路基病害无损检测车载探地雷达系统研制及应用[J].中国铁道科学,2006,127(5):139⁃144.

[64]黄敏.铁路路基病害车载雷达探测技术研究[D].长沙:中南大学,2011.

[65]江凯.探地雷达在路基检测中的应用[D].成都:西南交通大学,2011.

[66]李颜.路基冻土病害地质雷达探测ARMA功率谱识别算法研究及应用[D].长沙:中南大学,2009.

[67]李彦军.铁路路基测试用多通道探地雷达的硬件实现[D].西安:西安交通大学,2005.

[68]刘杰.探地雷达技术在铁路既有线中的应用[J].铁道建筑,2006,22(10):77⁃78.

[69]刘杰,张千里,马伟斌.采用探地雷达技术评估既有铁路路基状况的现状与发展[J].铁道建筑,2008(1):52⁃54.

[70]田胜昔.车载脉冲雷达超宽带天线研究[D].西安:西安交通大学,2010.

[71]铁道部运输局基础部.十年全路工务事故分析[M].北京:中国铁道出版社,2009.

[72]谢勇勇,廖红建,昝月稳.探地雷达检测铁路路基病害的二维正演模拟[J].浙江大学学报,2010,44(10):1907⁃1911.

[73]赵勐.基于探地雷达的铁路路基病害识别技术研究[D].石家庄:石家庄铁道大学,2012.

[74]昝月稳,章锡元,张安学.铁路路基检查车的研究[J].铁道工程学报,2007,108(9):17⁃21.

[75]昝月稳,张安学,小田义野.铁路路基状态检查车的研制及应用[J].路基工程,2007,134(5):30⁃31.

[76]昝月稳,李桂明,赵满庆.铁路车载探地雷达路基检测中的几个关键技术问题[J].西铁科技,2008,(2):2⁃4.

[77]昝月稳.高速扫描多通道铁路车载探地雷达系统[J].西铁科技,2009,(1):33⁃35.

[78]昝月稳.既有线路基状态检测评价技术的研究[M].//降峰,高亮,白雁,等.铁道工程设计、施工及养护新技术.北京:中国铁道出版社,2011.

[79]张振刚,张鸿儒,郭小红,谢永涛.高速铁路基床病害研究[J].中国安全科学学报,2002,12(6):18⁃20.